Been getting a lot of wonderful information around here lately.
Floor joist over concrete slab.
Install it flat on the slab surface with the outside edge aligned against the side wall or the edge of the floor line.
Floor joists over concrete slab.
Maybe i m using the wrong terminology.
1 pound of 1 1 2 inch deck screws.
3 4 subfloor over them.
However they just left the concrete for the floor so there are two steps down.
I believe the irc says 18 min between bottom of joists and floor in crawlspace.
Hopefully you guys can help me with a project i have in the works or at least on the drawing board if you will.
Over them going the direction of the pt on the concrete 16 o c.
They call them sleeper joists.
Ft but expect a weekend or two of hard labor.
One thing i ll say given the age of the slab and from what i ve seen of the rest of the construction the slab was probably poured right over grade with no vapor barrier or insulation as shown in the above drawing.
Because some water is seeping into the shed your first.
A concrete slab provides a firm stable base for pavers.
These will be the end sill plates that support the ends of the floor joists.
Secure each length to the slab with concrete nails spaced approximately 80 cm 32 inches apart and 20 to 30 cm 8 to 12 inches from each end.
Purchase 1 pound of 16d framing nails for every 20 square feet of floor.
Building a framed wood floor over an existing concrete slab can provide the space needed for electric wiring heat venting plumbing drain lines and added insulation when remodeling a basement or garage space.
Then install 24 x 1 1 2 foam between the 2x4 s.
Cover the patio with a thin layer of sand lay pavers over it and the results look like a standard paver patio.
What i want to do is frame a floor over the concrete that is level with the house floor.
Sleepers are long pieces of wood placed on the basement slab that support the subfloor.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be.
When i do this i will only have about 7 or 8 inches between the concrete.
Then lay 6 mil poly over it and staple it down.
This will give a minimum 1 1 2 inches space between the bottom of the flooring and the concrete slab and about 14 inches between joists.